Video Gallery

UTM

In preparation for the expansion of the University Of Toronto Kaneff Building, Triple M Demolition Inc. was contracted to perform selective demolition of the existing structure. There were many challenges to perform a safe partial removal of an active structure. Our team of experienced operators utilized our specialty Long Arm Excavator to safely and efficiently remove the outer ring of precast concrete and remove a partial section of the remaining building. Another successful job by Triple M Demolition Inc.

Whistle Bear

This is an aggregate plant Triple M Demolition, Inc. was contracted to demolish. As aggregate equipment becomes obsolete, the structures become unsafe and take up valuable property. The structural integrity of the building was failing and the only option to demolish the building safely was to use our Long Arm Excavator to safely and systematically downsize demolish the structure to be recycled.

(Visited 532 time, 1 visit today)